RCA Australia Banner 10
RCA Australia Banner 8
RCA Australia Banner 9
RCA Australia Banner 5
RCA Australia Banner 12
RCA Australia Banner 7
RCA Australia Banner 4
RCA Australia Banner 13
RCA Australia Banner 2
RCA Australia Banner 6
RCA Australia Banner 1

RCA Acoustics

Vibration Testing and Noise Monitoring Services

RCA Acoustics provides environmental noise and vibration assessment, monitoring and reporting  for all types of noise sources including blasting and construction applications.

RCA Acoustics can also develop noise control design and sound optimisation solutions and specifications for a wide range of project requirements including architectural and building code specifications,  noise control for industrial, road, rail and aircraft noise and open air concerts.

Environmental Acoustic Assessment:

  • Environmental Vibration Monitoring and Assessment
  • Development Assessments
  • Baseline Studies for EIS Preparation
  • Environmental Noise Monitoring

Road and Rail Noise and Vibration Assessment.

Environmental and Occupational Health and Safety Acoustics & Vibration.

Aircraft Noise Assessment and Building Noise Control Design.

Acoustic design of buildings and advice on use of materials for applications including:

  • Music Studios
  • Plant and Equipment
  • Office and Commercial Spaces
  • Retail Spaces

Australian Building Code Compliance:

  • Specification
  • Project Supervision
  • Testing and Certification

Heritage Building Assessment and Protection.

LAB Assessment and Compliance Studies and Noise Control Design for:

  • Clubs
  • Hotels
  • Other Entertainment Venues.

Machinery Noise Monitoring.

Environmental and acoustic monitoring for major clients includes the following:

  • Mining operations and machinery
  • Fertiliser manufacturers
  • Road construction
  • Poultry and food processing
  • Transportation industry
  • Municipal City Councils

Machinery Noise Monitoring

Machinery Noise Monitoring

Hunter Acoustics

Hunter Acoustics

Back to top

 

Send an Enquiry

  • This field is for validation purposes and should be left unchanged.